Streamline Environmental offers a broad range of Selected Projects.
Click any of the items listed below for more detailed information about each type.
| Environmental Assessments |
|
Nationwide 80+ facility environmental assessment project for major restaurant chain |
|
Nationwide project involving 30+ trucking terminals |
|
Phase I and II environmental assessment at semiconductor manufacturing facility |
|
Phase I assessment of 4,000 acre property involving multiple land uses |
|
Phase I assessments for community redevelopment project |
|
Phase II assessments for roadway expansion project |
|
| Contamination Assessment and Remediation |
|
Reclamation of 12-acre
industrial landfill at mining
facility |
|
Design and implementation of groundwater recovery trench at fertilizer plant |
|
Reclamation of groundwater contamination by heavy metals using in-situ pH adjustments at metal fabrication company |
|
Contamination assessment at municipal waste incinerator |
|
Petroleum impacted soil and groundwater remediation using multi-phase extraction and air sparging |
|
Bioremediation of solvent impacted groundwater |
|
Excavation and disposal of lead and arsenic impacted soils at battery manufacturing site |
|
Excavation and disposal of pesticide impacted soils at aerial spraying company |
|
Recovery and disposal of 7,000 gallons of free product |
|
Emergency spill response for trucking company |
|
| Waste Management |
|
Decommission and closure of industrial treatment ponds and chemical bulk terminal |
|
Decommissioning of 30+ PCB containing electrical transformers at phosphate processing facility |
|
Lead-based paint removal from 1000 feet of industrial piping |
|
Characterization, consolidation and disposal of 30 drums of industrial waste |
|
| Biologic/Hydrologic Assessments |
|
Performed water quality
monitoring for WMDs, FDEP, FDACS, etc. |
|
Implemented
irrigation re-use systems for agricultural Best
Management Practices |
|
Conducted over 100
macroinvertebrate stream habitat assessments using
FDEP (SCI) and SWFWMD protocols |
|
Selected over 100 stream locations
for WMD water quality/regulatory
monitoring |
|
|
Identified
and officially banned several exotic plants by
adhering to EPPC and FDACS
policies |
|
|
Performed botanical assessments in all
ecosystems throughout Florida and the United
States |
|
|
Implemented
phytoremediation systems | |
| Environmental Auditing and Permitting
|
|
Stormwater permit and compliance monitoring for large steel fabrication facility |
|
Air permit for automotive painting facility |
|
Industrial waste water permit for fertilizer plant |
|
Environmental audits for 30+ dry cleaning facilities |
|
Spill response plan for industrial port facility |
|
Stormwater Best Management Practices for fertilizer packaging plant |
|
Environmental audits of waste disposal facilities |
|
| Surface Water and Groundwater Studies |
|
Dye tracer test at mining facility to assess integrity of clay settling ponds |
|
Surface water quality and flow monitoring program for mining area watershed |
|
Water quality based effluent limitation study for wastewater permit |
|
Groundwater pumping test for siting of municipal water well |
|
Groundwater modeling for remediation project |
|
Surface water and sediment sampling for shipping channel dredging project |
|
| Tank Management |
|
Removal and closure of four, 10,000 gallon capacity gasoline and diesel underground storage tanks |
|
Cleaning and recertification of industrial process tanks |
|
Enhanced leak detection of petroleum underground storage tanks |
|